Notice Details

Title: Castlebay Pontoons & Shoreworks Isle of Barra
Published by: Wallace Stone LLP
Publication Date: 08/06/2015
Application Deadline: 19/06/2015
Deadline Date: 11/09/2015
Deadline Time: 12:00
Notice Type: Contract Notice
Has Documents: Yes
Abstract: The project comprises the installation of a yachting and small vessel marina near Horve, Castlebay, Isle of Barra along with the construction of a new access road, hard standing area and slipway for launching and retrieval of vessels.
Marine Works:-
The Contractor is required to design, fabricate and install a pontoon system including the mooring and anchoring system, access bridges, high level walkways, intermediate pier, intermediate landing pontoon, shore block and a concrete attenuator system.
The pontoons will be accessed from the shore via a raised access walkway and a pair of hinged access bridges with intermediate landing pontoon. The shore end of the access walkway requires to be supported on a concrete shore block abutment and the seaward end supported on a support pier. The shore end of the upper access bridge requires to be supported on the support pier with the seaward end supported on an intermediate landing pontoon which is located on a concrete landing slab constructed on a rock bund. The shore end of the lower access bridge requires to be supported on the intermediate landing pontoon and the seaward end requires to be supported on the pontoons.
The Tender requires 3 mooring options for the pontoons (piled, steel chain and nylon rope) to be proposed. The 3 options shall be priced separately with effects on programme assessed and likely risks to programme considered before choosing the final option and Contractor appointment.
The marine works will include the following: -
- Pontoons and finger piers,
- Pontoon moorings (optional - piled, steel chain with anchors or nylon rope with anchors)
- Concrete attenuators and removable access bridges with double articulation
- Concrete attenuator moorings (Steel chain and anchor only)
- High level access walkway, access bridges and intermediate landing pontoon
- Shore block abutment, intermediate support pier and rock bund support to landing pontoon
- Ancillary pontoon and attenuator equipment and services
Shore Works:-
The Contractor is required to design and construct the Shore Works which comprise the access road, an area of hard standing, access to the pontoon facility and a concrete slipway to the layout shown on the drawings.
The Shore Works will include the following: -
- Mobilisation and demobilisation to site.
- Site Clearance.
- Location and protection of services.
- Installation and maintenance of traffic management system.
- Removal and disposal of vegetation.
- Diversion of services.
- Removal and storage of topsoil.
- Excavation to formation level.
- Rockfill for hard standing area.
- Rock armouring to hard standing area.
- Service ducts, cabling, piping, draw pits, manholes.
- Lighting column installation.
- Surface drainage of hard standing and access road including tie in with public road.
- Forming accesses onto the public road at the pontoon access including alterations to footways and kerbs.
- Bitmac surfacing at hard standing and access road.
- Excavate and preparation for slipway foundations.
- Rock backfilling to slipway.
- Reinforced concrete slipway slab.

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Wallace Stone LLP

Doges Studio 2, Templeton on the Green,

Glasgow

G40 1DA

UK

Richard Donnet

+44 1415548233

r.donnet@wallacestone.co.uk

+44 1415544727
www.wallacestone.co.uk

1.2

Address from which documentation may be obtained


Wallace Stone LLP

Doges Studio 2, Templeton on the Green,

Glasgow

G40 1DA

UK


+44 1415548233

glasgow@wallacestone.co.uk

+44 1415544727
www.wallacestone.co.uk

1.3

Completed documents must be returned to:


Wallace Stone LLP

Doges Studio 2, Templeton on the Green,

Glasgow

G40 1DA

UK

Richard Donnet

+44 1415548233

glasgow@wallacestone.co.uk

+44 1415544727
www.wallacestone.co.uk

2 Contract Details

2.1

Title

Castlebay Pontoons & Shoreworks Isle of Barra

2.2

Description of the goods or services required

The project comprises the installation of a yachting and small vessel marina near Horve, Castlebay, Isle of Barra along with the construction of a new access road, hard standing area and slipway for launching and retrieval of vessels.

Marine Works:-

The Contractor is required to design, fabricate and install a pontoon system including the mooring and anchoring system, access bridges, high level walkways, intermediate pier, intermediate landing pontoon, shore block and a concrete attenuator system.

The pontoons will be accessed from the shore via a raised access walkway and a pair of hinged access bridges with intermediate landing pontoon. The shore end of the access walkway requires to be supported on a concrete shore block abutment and the seaward end supported on a support pier. The shore end of the upper access bridge requires to be supported on the support pier with the seaward end supported on an intermediate landing pontoon which is located on a concrete landing slab constructed on a rock bund. The shore end of the lower access bridge requires to be supported on the intermediate landing pontoon and the seaward end requires to be supported on the pontoons.

The Tender requires 3 mooring options for the pontoons (piled, steel chain and nylon rope) to be proposed. The 3 options shall be priced separately with effects on programme assessed and likely risks to programme considered before choosing the final option and Contractor appointment.

The marine works will include the following: -

- Pontoons and finger piers,

- Pontoon moorings (optional - piled, steel chain with anchors or nylon rope with anchors)

- Concrete attenuators and removable access bridges with double articulation

- Concrete attenuator moorings (Steel chain and anchor only)

- High level access walkway, access bridges and intermediate landing pontoon

- Shore block abutment, intermediate support pier and rock bund support to landing pontoon

- Ancillary pontoon and attenuator equipment and services

Shore Works:-

The Contractor is required to design and construct the Shore Works which comprise the access road, an area of hard standing, access to the pontoon facility and a concrete slipway to the layout shown on the drawings.

The Shore Works will include the following: -

- Mobilisation and demobilisation to site.

- Site Clearance.

- Location and protection of services.

- Installation and maintenance of traffic management system.

- Removal and disposal of vegetation.

- Diversion of services.

- Removal and storage of topsoil.

- Excavation to formation level.

- Rockfill for hard standing area.

- Rock armouring to hard standing area.

- Service ducts, cabling, piping, draw pits, manholes.

- Lighting column installation.

- Surface drainage of hard standing and access road including tie in with public road.

- Forming accesses onto the public road at the pontoon access including alterations to footways and kerbs.

- Bitmac surfacing at hard standing and access road.

- Excavate and preparation for slipway foundations.

- Rock backfilling to slipway.

- Reinforced concrete slipway slab.

NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at http://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=400858.

2.3

Notice Coding and Classification

391210 Roads - Construction
391213 Engineering
399999 other Works - Construction, Repair and Maintenance
120 Highlands and Islands

2.4

Total quantity or scope of tender

3 Conditions for Participation

3.1

Minimum standards and qualification required

4 Administrative Information

4.1

Type of Procedure

Single stage - Any candidate may submit a tender.

4.2

Reference number attributed to the notice by the contracting authority

1780

4.3

Time Limits

Time-limit for obtaining documentation
 19-06-2015

Time-limit for receipt of completed tenders
    03-07-2015  Time  12:00

Estimated award date
 28-08-2015

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

5 Other Information

5.1

Additional Information

(SC Ref:400858)

5.2

Additional Documentation

5.3

Publication date of this notice

 08-06-2015

Information added to the notice since publication.

Additional information added to the notice since it's publication.
DateDetails
09/06/2015 09:31ADDED FILE: 1780- G-001 - Instructions for Tendering

1780- G-001 - Instructions for Tendering
09/06/2015 09:32ADDED FILE: 1780-G-002 PCI

1780-G-002 PCI
09/06/2015 09:33ADDED FILE: 1780-G-003 Contract & Specification

1780-G-003 Contract & Specification
09/06/2015 09:35ADDED FILE: 1780-100 General Layout

1780-100 General Layout
09/06/2015 09:36ADDED FILE: 1780-101 Marine Works GA Sheet 1 of 2

1780-101 Marine Works GA Sheet 1 of 2
09/06/2015 09:37ADDED FILE: 1780-102 - Marine Works GA Sheet 2 of 2

1780-102 - Marine Works GA Sheet 2 of 2
09/06/2015 09:39ADDED FILE: 1780-103 - Shore Works - General Arrangement

1780-103 - Shore Works - General Arrangement
09/06/2015 17:21ADDED FILE: Wave Study

Wave Study
19/06/2015 12:27Submission Deadline/Application Deadline Date(s) Changed

The Deadline date was changed from 03/07/2015 12:00 to 17/07/2015 12:00.

The Application Deadline date was changed from 19/06/2015 to 19/06/2015.

Deadline date extended to allow adequate time for preparation of Tender Submission. Please note there is a change in the Tender Submission return address. All Tender Submissions now to be returned directly to: - Coimhearsnachd Bharraidh agus Bhatarsaidh Coismul Castlebay Isle of Barra Eilean Siar HS9 5XD Envelopes to clearly marked with the Project Title and 'Tender Return'.
09/07/2015 17:14Submission Deadline/Application Deadline Date(s) Changed

The Deadline date was changed from 17/07/2015 12:00 to 14/08/2015 12:00.

As a result of additional survey data (which may or may not influence design) being due to become available later in July and to allow this data to be processed and potentially incorporated in tenders it is proposed to extend the submission date.
09/07/2015 17:16or TendeREPLACED FILE0-G-001 Instructions fring - 03-06-15 - FINAL: 178

1780- G-001 - Instructions for Tendering - REV A
09/07/2015 17:28REPLACED FILE: 1780-G-003 - NEC3 Contract Doc - Pontoons 03-06-15 - FINAL

1780-G-003 Contract & Specification - REV A
15/07/2015 11:16REPLACED FILE: 1780-100

1780-100 General Layout Rev A
15/07/2015 11:17REPLACED FILE: 1780-103

1780-103 - Shore Works - General Arrangement - Rev A
15/07/2015 11:19ADDED FILE: Tender Queries No 1 15-07-15

Tender Queries No 1 15-07-15
23/07/2015 11:42REPLACED FILE: 1780-G-003 - NEC3 Contract Doc - Pontoons 09-07-15 - Rev A

1780-G-003 Contract & Specification - REV B
10/08/2015 15:08Submission Deadline/Application Deadline Date(s) Changed

The Deadline date was changed from 14/08/2015 12:00 to 28/08/2015 12:00.

Additional bathymetric survey data due Friday 14th August. The tender return date has been amended accordingly.
19/08/2015 16:48REPLACED FILE: 1780-G-003 - NEC3 Contract Doc - Pontoons 23-07-15 - Rev B

1780-G-003 Contract & Specification - REV C
21/08/2015 13:28Submission Deadline/Application Deadline Date(s) Changed

The Deadline date was changed from 28/08/2015 12:00 to 11/09/2015 12:00.

The deadline date has been further extended to allow time to review the additional survey data. Drawings with updated survey information is expected to be made available next week.
25/08/2015 16:48REPLACED FILE: 1780-100 A

1780-100 General Layout Rev B
25/08/2015 16:49REPLACED FILE: 1780-101

1780-101 Marine Works GA Sheet 1 of 2 - Rev A
25/08/2015 16:51REPLACED FILE: 1780-102

1780-102 - Marine Works GA Sheet 2 of 2 - Rev A
25/08/2015 16:52REPLACED FILE: 1780-103 A

1780-103 - Shore Works - General Arrangement - Rev B
07/09/2015 10:42CAD Drawings

CAD versions of the Tender drawings can be made available on request. Please email R.Donnet@wallacestone.co.uk
Main Contact: r.donnet@wallacestone.co.uk
Admin Contact: glasgow@wallacestone.co.uk
Technical Contact: N/a
Other Contact: glasgow@wallacestone.co.uk

Commodity Categories

Commodity Categories
IDTitleParent Category
391213EngineeringWorks - Construction, Repair and Maintenance
391210Roads - ConstructionWorks - Construction, Repair and Maintenance
399999other Works - Construction, Repair and MaintenanceWorks - Construction, Repair and Maintenance

Delivery Locations

Delivery Locations
IDDescription
120Highlands and Islands

Document Family

Hide related notices
JUN210852: Castlebay Pontoons & Shoreworks Isle of Barra
Publication Date: 08/06/2015
Deadline: 11/09/2015
Notice Type: Contract Notice
Authority name: Wallace Stone LLP
NOV225198: Castlebay Pontoons & Shoreworks Isle of Barra
Publication Date: 04/11/2015
Notice Type: Contract Award Notice or Call Off from Framework
Authority name: Wallace Stone LLP

Further Instructions

The Buyer has attached further instructions with this notice. Please read these carefully and take the necessary action(s).

Record your interest in this notice and you will be automatically sent clarifications and deadline date changes etc. Please note that recording your interest does not automatically enter you into the tender process for this notice, you still have to submit your response by the deadline stated. To record an interest in this notice and add it to your interests list please click the Record your interest now button at the top of the page.

The following additional documents have been attached to this notice. To obtain these documents please select the individual file names below.

Alternatively, you can download all current documents (Zip File)

Current Documents

CreatedNameDescriptionSizeDownloads
09/06/2015 1780-G-002 - PCI - 03-06-15-FINAL 1780-G-002 PCI121.96 KB1
09/06/2015 IBE0974 - Castle Bay Pontoons wave model study Wave Study2.15 MB0
09/07/2015 1780-G-001 Instructions for Tendering - 07-07-15 - Rev A 1780- G-001 - Instructions for Tendering - REV A61.44 KB0
15/07/2015 1780-G-004 Tender Queries 1 - 15-07-15 Tender Queries No 1 15-07-1558.38 KB0
19/08/2015 1780-G-003 - NEC3 Contract Doc - Pontoons 19-08-15 - Rev C 1780-G-003 Contract & Specification - REV C496.57 KB3
25/08/2015 1780-100 B 1780-100 General Layout Rev B453.17 KB4
25/08/2015 1780-101A 1780-101 Marine Works GA Sheet 1 of 2 - Rev A166.32 KB0
25/08/2015 1780-102A 1780-102 - Marine Works GA Sheet 2 of 2 - Rev A193.30 KB0
25/08/2015 1780-103B 1780-103 - Shore Works - General Arrangement - Rev B245.80 KB2

Replaced Documents

CreatedNameDescriptionSize
09/06/20151780-G-001 Instructions for Tendering - 03-06-15 - FINAL1780- G-001 - Instructions for Tendering88.89 KB
09/06/20151780-G-003 - NEC3 Contract Doc - Pontoons 03-06-15 - FINAL1780-G-003 Contract & Specification785.97 KB
09/06/20151780-1001780-100 General Layout1.14 MB
09/06/20151780-101 1780-101 Marine Works GA Sheet 1 of 2149.61 KB
09/06/20151780-1021780-102 - Marine Works GA Sheet 2 of 2185.51 KB
09/06/20151780-1031780-103 - Shore Works - General Arrangement443.29 KB
09/07/20151780-G-003 - NEC3 Contract Doc - Pontoons 09-07-15 - Rev A1780-G-003 Contract & Specification - REV A489.58 KB
15/07/20151780-100 A1780-100 General Layout Rev A506.66 KB
15/07/20151780-103 A1780-103 - Shore Works - General Arrangement - Rev A249.41 KB
23/07/20151780-G-003 - NEC3 Contract Doc - Pontoons 23-07-15 - Rev B1780-G-003 Contract & Specification - REV B497.33 KB

Copyright © Public Contracts Scotland